S. AFRICA: MALAWI: NEW BRIDGE BEING BUILT ACROSS THE SHIRE RIVER REPLACES OLD FERRY
Record ID:
230631
S. AFRICA: MALAWI: NEW BRIDGE BEING BUILT ACROSS THE SHIRE RIVER REPLACES OLD FERRY
- Title: S. AFRICA: MALAWI: NEW BRIDGE BEING BUILT ACROSS THE SHIRE RIVER REPLACES OLD FERRY
- Date: 17th November 1966
- Summary: 1. MV TRACTOR ON RIVER BANK 0.05 2. MCU TRACTOR ROPE 0.06 3. LV FERRY BEING HAULED ACROSS RIVER 0.11 4. MV FERRY APPROACHING BANK 0.18 5. MLV PASSENGERS AND CARS OFF FERRY 0.21 6. MLV EQUIPMENT FOR MAKING NEW BRIDGE (2 SHOTS) 0.33 7. TV PITS FOR TAKING BRIDGE PILES (2 SHOTS) 0.46 8. LV CRANES WORKING ON EMBANKMENT FOR NEW BRIDGE 0.56 Initials RM/V/BHH/GLH Script is copyright Reuters Limited. All rights reserved
- Embargoed: 2nd December 1966 12:00
- Keywords:
- Location: CHICKWAWA, SOUTH OF BLANTYRE, MALAWI
- Country: South Africa
- Reuters ID: LVAEFMPYS0CYCR8WVHE11YBZQLOP
- Story Text: IN MALAWI, ENGINEERS ARE BUILDING A BIG BRIDGE ACROSS THE SHIRE RIVER, 30 MILES SOUTH OF BLANTYRE IN THE CHIKAWAWA AREA, TO REPLACE A FERRY SERVICE. MALAWI IS ANXIOUS TO REPLACE ALL ITS FERRIES FOLLOWING THE SINKING OF A FERRY ON THE SHIRE RIVER NEAR LIWONDE LAST YEAR WHEN A NUMBER OF PEOPLE LOST THEIR LIVES.
THE FERRY TO BE REPLACED CHUGS ACROSS THE RIVER ALONGSIDE THE NEW BRIDGE UNDER CONSTRUCTION. WORK BEGAN ON THE BRIDGE ALMOST EXACTLY ONE YEAR AGO, AND IT'S EXPECTED TO BE COMPLETED AT ABOUT THIS TIME NEXT YEAR. THE BRIDGE WILL BE 24 FEET (7 METRES) WIDE AND 640 FEET (ABOUT 200 METRES) LONG. IT WILL RISE 51 FEET (ABOUT 15 1/2 METRES) ABOVE THE RIVER BED.
- Copyright Holder: REUTERS
- Copyright Notice: (c) Copyright Thomson Reuters 2015. Open For Restrictions - http://about.reuters.com/fulllegal.asp
- Usage Terms/Restrictions: None